c 1920 BELLEVILLE Separator THRESHER Harrison FARM Machinery ANTIQUE Brochure
USD 16.00 USD
Specifications
| Type Of Advertising | Brochure |
| Original/Reproduction | Original |
| Date Of Creation | c 1920 |
| Brand | Belleville |
| Date Of Origin | c 1920 |
Antique original c. 1920 The Baby Belleville Separator, Manufactured by the Harrison Machine Works, Belleville, Ill. U. S. A. brochure. A tear at one of the fold intersections.